πΊοΈ
Case StudyMarch 20268 min read
We Analyzed Meta's 393-Acre Data Center Site in Temple, TX β Here's What the Terrain Shows
Meta's $800M hyperscale campus in Temple sits on 393 acres of central Texas terrain. We ran Androne's full terrain, flood, and infrastructure analysis on the actual AOI. The results explain a lot about why this site won.
Read analysis β